Ground-mounted · checked 2 November 2026
Ground-mounted solar panels in Kerry
Panels on a frame in the garden don't need planning permission if all the free-standing panels together cover no more than 25 m², stand no higher than 2.5 m, aren't in front of the house, and leave at least 25 m² of garden behind or beside it.
- No planning up to 25 m² at a house
- 60% TAMS 3 grant on farms
- One installer rings you, not a list
Last checked 2 November 2026: SEAI grant rules (scheme guide v6.0) and Purevolt's and Selectra's published prices, read at source. Output from EU PVGIS and weather from Met Éireann, read 29 October 2026.
Do I need planning permission for ground-mounted panels?
Panels on a frame in the garden don't need planning permission if all the free-standing panels together cover no more than 25 m², stand no higher than 2.5 m, aren't in front of the house, and leave at least 25 m² of garden behind or beside it.
| Rule | Exempt from planning at a house if |
|---|---|
| Total panel area | No more than 25 m², counting any free-standing panels already there |
| Height | No more than 2.5 m above the ground at the highest point |
| Position | Not forward of the front wall of the house |
| Garden left | At least 25 m² of private open space behind or beside the house |
| Conservation areas | Only if the panels don't materially affect the character of the area |
| Glint and glare | Panels that cause hazardous glint or glare aren't exempt, and must be covered or removed until it's fixed |
From S.I. No. 493 of 2022, Planning and Development (Exempted Development) (No. 4) Regulations, Class 2(c), read 2 November 2026. These are the rules for houses; apartments aren't covered. Panels on the roof have their own rules: no more than 15 cm above the roof (50 cm on a flat roof) and at least 50 cm from the edge.
Does the SEAI grant cover ground-mounted panels?
SEAI's guide doesn't say either way: it covers panels on the roof of the house, and doesn't mention ground mounts, garages or outbuildings.
From SEAI Solar PV Scheme Application Guide, v6.0, 12 Oct 2026. Ask SEAI on (01) 808 2100 or solarpv@seai.ie, and get the answer in writing, before you plan on the grant. On a farm, the Solar Capital Investment Scheme under TAMS 3 pays 60%, with its own €90,000 investment ceiling, and the array can include the needs of one house on the holding (gov.ie, Solar Capital Investment Scheme under TAMS 3).
How much does a ground-mounted array make in Kerry?
A frame can face due south at about 35°, so it makes what a south roof at that angle makes: about 876 kWh per kWp a year in Tralee, up to 897 in Cahersiveen.
| Town | South at 35° | East and west | Panels at 10° |
|---|---|---|---|
| Cahersiveen | 897 | 727 | 834 |
| Dingle | 894 | 721 | 826 |
| Tralee | 876 | 710 | 807 |
| Listowel | 872 | 707 | 802 |
| Kenmare | 852 | 699 | 791 |
| Castleisland | 849 | 694 | 786 |
| Killorglin | 838 | 689 | 780 |
| Killarney | 806 | 670 | 755 |
kWh a year per kWp, from EU PVGIS 5.2, 2005–2020 satellite record, 14% losses, local hills included. PVGIS models building-mounted panels; a free-standing frame is our comparison.
What about Kerry's wind?
Valentia has recorded gusts of up to 88 knots and averages 6.8 days of gales a year, so ask what wind load the frame and its foundations are rated for.
From Met Éireann, Valentia 1991–2020 averages. A frame in an open field near the coast takes more wind than panels flat on a roof, so ask for the foundation design on the quote.
FAQ
Quick answers
Do I need planning permission for ground-mounted solar panels?
Panels on a frame in the garden don't need planning permission if all the free-standing panels together cover no more than 25 m², stand no higher than 2.5 m, aren't in front of the house, and leave at least 25 m² of garden behind or beside it. (S.I. No. 493 of 2022, Planning and Development (Exempted Development) (No. 4) Regulations)
Does the SEAI grant cover ground-mounted panels?
SEAI's scheme guide doesn't mention ground-mounted panels, garages or outbuildings; it talks about panels on the roof of the house (SEAI Solar PV Scheme Application Guide, v6.0, 12 Oct 2026). Ask SEAI on (01) 808 2100 or solarpv@seai.ie before you count on the grant.
Is there a grant for ground-mounted solar on a farm?
Farms use the Solar Capital Investment Scheme under TAMS 3: 60% grant, with its own €90,000 investment ceiling, and the array can be sized to include one dwelling house on the holding (gov.ie, Solar Capital Investment Scheme under TAMS 3).
Do ground-mounted panels make more power?
They can face due south at about 35°, so they match a south roof: about 876 kWh per kWp a year in Tralee and 897 in Cahersiveen (EU PVGIS 5.2).
How much do ground-mounted solar panels cost?
None of the Irish installers we checked publish a ground-mount price, so ask for the frame, the foundations and the cable trench to the house itemised on the quote.
Keep reading
More on solar in Kerry
- Solar panel cost in Kerry
- The SEAI solar grant
- Solar batteries in Kerry
- Solar panel installers in Kerry
- How many panels you need
- Kerry towns compared
- Solar panels in Tralee876 kWh per kWp a year
- Solar panels in Killarney806 kWh per kWp a year
- Solar panels in Listowel872 kWh per kWp a year
- Solar panels in Kenmare852 kWh per kWp a year
- Solar panels in Dingle894 kWh per kWp a year
- Solar panels in Castleisland849 kWh per kWp a year
- Solar panels in Killorglin838 kWh per kWp a year
- Solar panels in Cahersiveen897 kWh per kWp a year
Free price
Get a solar price in 3 quick taps
Tell us about the house. It goes to one local SEAI-registered installer who covers your area, and they ring you with a price.
Where these numbers come from (14 public sources, checked 2 November 2026)
- Irish Times, 15 Oct 2026
- SEAI Solar PV Scheme Application Guide, v6.0, 12 Oct 2026
- Grant Thornton
- Selectra, updated 12 Sep 2026
- Irish Times, 25 Sep 2026
- Solar Safeguarding Zone data, Dept of Housing
- Pager Power, quoting the Oireachtas housing committee
- gov.ie, 7 Oct 2022
- Kerry County Council conservation areas, data.gov.ie
- ESB Networks
- Met Éireann, Valentia 1991–2020 averages
- EU PVGIS 5.2
- S.I. No. 493 of 2022, Planning and Development (Exempted Development) (No. 4) Regulations
- gov.ie, Solar Capital Investment Scheme under TAMS 3